TIE-BACKS

This method is often uses where hillside creep or instability of the hillside is present.
Tie-backs are hydraulically driven 15-30 feet into the hillside directly through holes cut into the retainer wall. 
 
enerally spaced at 4-6 feet apart and covered with a concrete or steel cap to hide the hole.
Tie-backs are often combined with other methods like columns or stem walls to both stabilize and straighten leaning or failing retainer walls. 
 
Need a Quote ?
Call Us at (661) 215-6681 or Feel free to fill-up and submit the Contact Us form below.
Contact Us

Our sales engineering and estimating experts are here to tackle any foundation or concrete problem you may be experiencing. Contact us today to discuss your specific needs and requirements.

Standard Business Hours

Monday – Friday 8:00 – 6:00 PST

Emergency Contact

661-294-1313

TOP